Tuesday, June 15, 2010

Window and door cutouts

We are finally to that point in building where you can take a step back and look at what you have in front of you and begin to imagine what it might look like when its finished. Last night, we cut out the door and window openings and the place really took shape. I have included some low quality cell phone pictures that I couldn't resist taking because the building took on such monumental changes all in a matter of minutes.

The roofing underlayment is done now and we got some prices for our metal roofing. Looks like the roof along with the higher end stove pipe fittings is still going to come in under budget for us, which is a great thing right now. Fingers crossed that we'll be living in this place by September. The plan that is residing in my head is to see if we can get in here before we need to buy any oil at the rental cabin. It'd be great to be able to forego that expense.


Looking South and West from inside

Looking North East from inside

From the South West viewpoint

Sunday, June 13, 2010

loaded up


loaded up
Originally uploaded by justinmaple

Our ride in. The junky little trailer, loaded down with about 300 lbs worth of fish made it along about 4 miles of rough trail before it finally gave in and a wheel fell off. We still had a mile to go, with the help of someone who was stuck behind us (narrow trail, trailer in the way blocking it) we were able to haul everything back to the truck.

dipnetting


dipnetting
Originally uploaded by justinmaple

dipnetting


dipnetting
Originally uploaded by justinmaple

dipnetting


dipnetting
Originally uploaded by justinmaple

dipnetting


dipnetting
Originally uploaded by justinmaple

Putting the dipnet to work in a back eddy, catching salmon as they move upstream.

salmon on


salmon on
Originally uploaded by justinmaple

Joel dipnetting


Joel dipnetting
Originally uploaded by justinmaple

3 am and its quittin time


3 am and its quittin time
Originally uploaded by justinmaple

decking completed


decking completed
Originally uploaded by justinmaple

Last sections


Last sections
Originally uploaded by justinmaple

Moving towards the center


Moving towards the center
Originally uploaded by justinmaple

working our way up the north side


shapes
Originally uploaded by justinmaple

Starting the North side


Starting the North side
Originally uploaded by justinmaple

plywood decking going on


plywood decking going on
Originally uploaded by justinmaple

Sunday, May 23, 2010

Done


Done
Originally uploaded by justinmaple

finished. A hard days work.

Now for some sheathing and to save some more money for the real metal roof.

wrapping up the last one


wrapping up the last one
Originally uploaded by justinmaple

making sure everything is level before installing the lateral bracing

truss lifting


truss lifting
Originally uploaded by justinmaple

getting close to the end. Spent an entire day getting all of this worked out and in place.

truss lifting


truss lifting
Originally uploaded by justinmaple

We worked in batches of 4 (our jigs were only holding 4 at a time) and then we'd tie them in with bracing and move on to the next batch.

truss lifting


truss lifting
Originally uploaded by justinmaple

Garage construction


Garage construction
Originally uploaded by justinmaple

Second truss in place, held upright by one of the jigs Chrissy and Alex made.

Garage construction


Garage construction
Originally uploaded by justinmaple

2 gable trusses in place

Garage construction


Garage construction
Originally uploaded by justinmaple

All of the trusses up on to the plates. First 5 are upright, second 7 are dropped so we can just slide them across and flip them up. It all worked out perfectly.

Garage construction


Garage construction
Originally uploaded by justinmaple

bracing the gable end truss from behind and using bungee cords to hold the subsequent stack in place.

Garage construction


Garage construction
Originally uploaded by justinmaple

This was a bit awkward. Lifting these things with a crane is the preferred method, but our soft, new driveway wouldnt allow it.

Garage construction


Garage construction
Originally uploaded by justinmaple

Both garage door headers installed now, all 4 walls ready to go. Trusses stacked and ready to be lifted into place.

last gable end truss coming down the drive


last gable end truss coming down the drive
Originally uploaded by justinmaple

sliding them in


sliding them in
Originally uploaded by justinmaple

Big trusses. 34 feet long, 7 feet tall.

sledge and dog


sledge and dog
Originally uploaded by justinmaple

Only way to get these trusses down the hill was by hand. Joel devised a sledge of sorts so that we could both work together on one end and pull.

trusses in the air


trusses in the air
Originally uploaded by justinmaple

Its coming along


Its coming along
Originally uploaded by justinmaple

Trusses delivered from Fairbanks Truss

window insert


window insert
Originally uploaded by justinmaple

For the time that we live in the garage, we're putting windows in place of the garage doors. Nice big 4x5 windows. We built the inserts so they can come out and then be used as walls for our future treehouse.

tieing the last wall in


tieing the last wall in
Originally uploaded by justinmaple

Joel and I pulling the final wall sections together

all the makings for fun


all the makings for fun
Originally uploaded by justinmaple

3 walls, strong enough to stand on


3 walls, strong enough to stand on
Originally uploaded by justinmaple