working up the hill
Originally uploaded by justinmaple
Uphill with the plate packer.
archive
Gravel down, Chrissy packing it in. 1 am thursday night.
We had to widen our driveway to make sure it will accomodate concrete trucks and by bringing it up a few feet, we lessened the grade too.
Got them all stacked eventually. 42 total in the one stack.
The process of bringing the logs up to the pile where they will finish drying and wait for milling.
Had to skid all the logs so that we could pick them up with the bucket on the backhoe and stack them off in the background in that pile. Top right.
I am still unclear about what kind of beetle this guy is. Anyone know?
Filling in the old driveway bed with new dirt and raising the whole thing up a few feet.
Just stitched together some photos from out in the middle of the main channel of the Tanana.
Phase one of comfortable bathroom experiences.
Found a secret hillside totally full of wild pasque flowers.
1 big burbot that fried up to feed 3 people. Yum.
Some of the 45 logs we have saved for milling siding later this year
The painful view from the inside.