Thursday, July 2, 2009

2½ of the sides of the first forms up


2½ of the sides of the first forms up
Originally uploaded by justinmaple

Still waiting to hear if the concrete people can make it down the driveway with a full truck. If they can, we'll do two pours, one for the footers and one for the pad. If they cant, we'll have to hire a pump trailer to run the concrete down the 268 feet from the road above. This would also mean that we'll have to do a monolithic pour which is the less preferred way for us. Less forms to build, but big pain since we need to put down 2" of extruded polystyrene and 2 more inches of gravel down under the pad but not the footers.